National Fire Protection provided our fire protection services for the Conrac and AMP Construction phase at Tampa International Airport. The scope of this work included providing code compliant design, calculations and installation of the fire protections systems throughout the phased areas.
The systems for this project included wet pipe sprinkler systems, fire pumps and high expansion foam systems. These engineered fire protection systems protected various areas including the rental car facility, concourse and the passenger substations along the airport’s tram system.